These short summaries connect VROOF services with published articles on Johor Roof Repair. Follow each title or “Read the original Field Note” link for the full article and original photographs. Publication dates shown are article dates, not project completion dates.
At Permas Jaya, existing toilet tiles were retained while grout joints were prepared, re-grouted and treated. The article also records floor-trap preparation for a ponding test and explains why a no-hack approach is case dependent.
This Nusantara roof slab record follows cleaning and preparation through grey KOTE22 application. It highlights continuity between the main slab, perimeter and upturns rather than treating the horizontal surface alone.
The Ehsan Jaya article documents targeted work at ageing roof fixings and the party wall/capping junction. The original red roof remained visible; the recorded treatment covered selected details rather than the whole roof.
At BS Freshmart in Mersing, the record covers roof preparation and TOR30 3mm torch-on membrane installation. Membrane overlaps, perimeter edges and upturn detailing are shown in the original article.
Recovered project records from Rini Home 2 show preparation of an exposed concrete roof slab and coating application. The note explains how wall junctions and perimeter upturns were included in the waterproofing work.
A Kempas ceiling-seepage repair illustrates how the suspected water path informed injection-point positioning. The note also discusses protecting the work area, observing the injection response and reaching concrete above a plaster ceiling.
The Cascadia record combines repair of selected deteriorated membrane areas with a new gutter to redirect concentrated runoff from a metal deck. It explains why managing the water path mattered alongside repairing the membrane.